multiple LL126 Parking garage inspections & Restoration
As part of Sub-Cycle 1A & 1B, HAWA Engineering P.C. was commissioned by multiple property management firms and owners throughout Manhattan and Brooklyn to fulfill all requirements for Local Law 126 and bring their parking structures to a SAFE condition.
This process began with a full walkthrough inspection of the parking garages following by compiling all findings, photographs, and drawings into a report filing which was submitted to the NYC DOB.
If any SREM (Safe with Repairs and/or Engineering Monitoring) or UNSAFE conditions were found within the parking structures, HAWA was requested by owners to assist in restoring garages to a SAFE condition. This was accomplished by first designing and developing drawing sets for all necessary public-protection measures/repairs and subsequently filing for Type II Alteration. Work permits were then obtained and the restoration process was managed until all conditions were repaired.
With Sub-Cycle 1C underway, HAWA can not only ensure your parking structures are properly inspected and recorded for the DOB but also lead the repair process from design to execution to ensure filings are reported as SAFE and no further action or DOB monitoring is required.
Want to learn more about Local Law 126? Click here.